Figure 13. The 1-m2 MOCNESS being deployed for a day tow from the stern of the R/V Johan
Hjort. Note the metal framework on the sides of the MOCNESS was designed by engineers
at IMR in Bergen to enable the system to be easily deployed and recovered on
the stern ramp of the vessel. Storfjorden, 1993.
(Photo by Peter Wiebe)