Proposed Work - Year 1: 2002 - 03
Complete
FVCOM dev & diurnal heating/tidal mixing front process study (1)
Physical component online environmental chronology (2)
Synthesis of 1999 bank-wide stratification data (3)
Assessment of interannual variability for SSCs on Northeast Peak
from historical hydrographic database (4)
Synthesis of 1999 southern TMF physical/biological data (5)
Analysis of structure, variability, and loss potential of SSF (3, 4)
Start
Realistic FVCOM simulations of 1995, 1999 stratification seasons
(1, 3)
Realistic FVCOM simulation of 1999 dye dispersion/mixing data (5)
Process FVCOM studies of frontal exchange mechanisms along
northern flank (1)