The 1995 and 1999 Experiments
1. Run the model with tidal forcing only from December  1-15;
2. Re-start the model on December 15 with the initial condition of T and S
given by December climatologic hydrographic field;
3. Add real-time wind stress, heat flux, river discharge, etc on January 1
Simulating