U.S. GLOBEC Georges Bank Program - Phase 2
Vessel Equipment and Facilities Requirements



Equipment or Facilities
Program Activity
Broad-Scale Cruises Process Cruises Long-term Mooring Cruises
DECK
Trawl winch /w conducting cable for 10m2 MOC (.68")
Yes
Yes, coax
cable needed
Yes (conducting wire not

needed)

Medium winch /w conducting cable for double 1m2 MOC (0.322")
Yes
Yes
Not needed
Two stern mounted deck winches and davits for mid-water trawl
Not needed
Yes
Not needed
Small winch for pump and collection of live samples
Yes
Yes
Not needed
Zodiac for diving
Not needed
Yes
Not needed
CTD/rossette with 10-liter Go-flow bottles
Yes
Yes
Yes
Uncontaminated running sea water
Yes
Yes
Not needed
Crane for mooring deployments
Not needed
Not needed
Yes
Davit for towed acoustics
Yes
Yes
Not needed
LABORATORY
PDR
Yes
Yes
Yes
-80c freezer
Yes
Yes
Not needed
Standard freezer
Yes
Yes
Not needed
Refrigerator
Yes
Yes
Not needed
De-ionized water
Not needed
Yes
Not needed
Fume hood
Yes
Yes
Not needed
Provisions for isotope handling
Yes
Yes
Not needed
Dark room
Yes
Yes
Not needed
Microscope & video space
Yes
Yes
Not needed
Provisions for liquid nitrogen
Yes
Yes
Not needed
OTHER
ADCP
Yes
Yes
Yes
SAIL communication loop
Yes
Yes
Yes
Continuous surface temp/salt/fluoro
Yes
Yes
Yes
Metereological measurements
Yes
Yes
Yes
Loran/GPS Note: higher resolution P-code GPS required for some cruises
Yes
Yes
Yes
ATS/fax
Yes
Yes
Yes
Satellite imagery transfer
Yes
Yes
Yes
Xerox machine
Yes
Yes
Yes
Clean electrical power
Yes
Yes
Yes
Ample scientific storage for samples
Yes
Yes
Not needed

Click here for the 1997 ship schedule.


Last updated: October 22, 1996