List of U.S. GLOBEC Georges Bank Projects

Follow the links to a list of the participants and their summary work statements (when available). To view the ship schedules undertaken during the program click here.

Note that the process, mooring and broad-scale field studies took place during 1995, 1997, and 1999. During 1996 and 1997, only the broad-scale and mooring field studies took place.

  • Phase 1 - Stratification of Water Column (1994-1996)
  • Phase 2 - Source, Retention and Loss Processes (1996-1999)
  • Phase 3 - Cross-frontal Exchange Process (1999-2000)

  • Phase 4 - Modeling and Synthesis (2002-2006)

  • Phase 4-B - Modeling and Synthesis (Phase IV-B) (2006-2009)


    Last modified: June 6, 2007