List of U.S. GLOBEC Georges Bank Projects
Follow the links to a list of the participants and
their summary work statements (when available). To view the
ship schedules undertaken during the program click
here.
Note that the process, mooring and broad-scale field studies took place during
1995, 1997, and
1999. During 1996 and 1997, only the broad-scale and mooring field studies took place.
Phase 1 - Stratification of
Water Column (1994-1996)
Phase 2 - Source, Retention
and Loss Processes (1996-1999)
Phase 3 - Cross-frontal
Exchange Process (1999-2000)
Phase 4 - Modeling and
Synthesis (2002-2006)
Phase 4-B - Modeling and
Synthesis (Phase IV-B) (2006-2009)
Last modified: June 6, 2007